Metrohm Inline Dialysis User Manual

Page 15

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

IC equipment: Dialysis

■■■■■■■■

9

■

Using the tweezers, place the wet dialysis membrane centrally
inside the sealing ring onto the cell.

7 Assembling the dialysis cell

■

Place the upper part of the dialysis cell on the bottom part in such
a way that the two guide bolts fit exactly into the two bore holes.

8 Screwing the dialysis cell together

■

Screw the five screws with the washers in the dialysis cell by hand
first.

■

Then firmly tighten them with the hex key in crosswise sequence.

Advertising