GBC Usp13 User Manual

Page 9

Advertising
background image

7

Position front (#49) and rear (#56 & #48) supply stack guides so that the posts clear the

paper stack by about 1/16”. A stack of 2 to 3 inches is required.
Locate adjustable stack guide post (#59) so that the post is in line with the separating knife.

(Figure 13).

Install front guide rail (#55) so that there is about 1/8” to 1/4” clearance between the lift

being transferred and the front guide rail.
Cycle machine and check results.

48

56

49

59

29

55

108

TO BE IN

LINE

Figure 13

Figure 14

Advertising