Klimaire 13 SEER Series User Manual

Page 9

Advertising
background image

Ins ulated Liquid Line

Tape

Sheet Metal Hanger

Correct

Incorrect

Fig.5 Typical Installtion

Fig.3 Tubing Hanger

Fig.4 Underground Installation

All outdoor unit and evaporator coil connections are copper-to-copper and should be
brazed with a phosphorous-copper alloy material such as Silfos-5 or equivalent. DO
NOT use soft solder. The outdoor units have reusable service valves on both the liquid
and vapor connections. The total system refrigerant charge is retained within the
outdoor unit during shipping and installation. The reusable service valves are provided
to evacuate and charge per this instruction.
Serious service problems can be avoided by taking adequate precautions to assure an
internally clean and dry system.

3.6 PRECAUTIONS DURING BRAZING OF LINES

8

Ins ulated Vapor Line

TO
INDOOR
BLOWER

TO
POWER
SUPPLY

TO
COIL

WEATHERPROOF
DISCONNECT
SWITCH

Seal opening(s) with
permagumor equivalent

NOTE:All outdoor wiring must be weather proof

Advertising