tekmar 370 House Control User Manual

Page 11

Advertising
background image

Copyright © D 370 -06/99

11 of 20

STEP THREE

ROUGH-IN WIRING

All electrical wiring terminates in the control base wiring chamber. The base has standard 7/8" (22 mm) knockouts which accept common
wiring hardware and conduit fittings. Before removing the knockouts, check the wiring diagram and select those sections of the chamber
with common voltages. Do not allow the wiring to cross between sections as the wires will interfere with safety dividers which should
be installed at a later time.

Power must not be applied to any of the wires during the rough-in wiring stage.

• Install the Outdoor Sensor 070 and Boiler Sensor 071 according to the instructions in the Data Brochure D 070 and run the wiring

back to the control. If the 370 is used as a mixing control, a Supply Sensor 071 is required. Install the Supply Sensor according to
the instructions provided in the Data Brochure 070 and run the wiring back to the control.

• If an Indoor Sensor 076 is used, install the Indoor Sensor(s) according to the installation instructions in the Data Brochure 070 and

run the wiring back to the control.

• If an RTU 054 is used, install the RTU(s) according to the installation instructions provided in the Data Brochure D 054 and run the

wiring back to the control.

• If a Zone Control is used, run the wires from the Zone Control to the 370. Refer to the instructions supplied with the Zone Control.

• Run wiring from the other system components (pumps, boiler, motorized zone valves, etc.) to the control.

• Run wires from the 120 V (ac) power to the control.

Use a clean power source to ensure proper operation.

• Multi-strand 16 AWG wire is recommended for all 120 V (ac) wiring due to its superior flexibility and ease of installation into

the terminals.

STEP FOUR

ELECTRICAL CONNECTIONS TO THE CONTROL

The installer should test to confirm that no voltage is present at any of the wires. Push the control into the base and slide it down until
it snaps in firmly.

Powered Input Connections











120 V (ac) Power

Connect the 120 V (ac) power supply to terminals

Power N — L (2 and 3).

DHW Demand

If a DHW Demand is used, connect the wiring from the DHW Demand circuit to
terminals

DHW Dem — DHW Dem (22 and 23). When 120 V (ac) or 24 V (ac) is applied

to these terminals, the control recognizes a DHW Demand.

Output Connections











System Pump

Connect one wire from the system pump to the

Sys Pmp (1) terminal on the control. The

other wire on the system pump must be connected to the Neutral (2) side of the 120 V
(ac) power supply. The control closes a dry relay contact between

Sys Pmp — Power L

when operation of the system pump is required.

Variable Speed Injection Pump

The 370 can vary the speed of a permanent capacitor, impedence protected or
equivalent pump motor that has a locked rotor current of less than 2.4 A. Most small
wet rotor circulators are suitable as described in Essay E 021.

The variable speed

output must not be used on pumps which have a centrifugal switch. The 370 has an
internal overload protection fuse which is rated at 2.5 A 250 V (ac). This fuse is not field
replaceable. Contact your tekmar sales representative for details on the return and
repair procedures if this fuse is blown.

Connect one wire from the variable speed injection pump to the

Var. Pmp (4) terminal

on the control. The other wire on the variable speed injection pump must be connected
to the

Neutral (2) side of the 120 V (ac) power supply, or to L2 for a 240 V (ac) power

supply. The control varies the power to the pump in order to change its speed.

Boiler

Connect the 120 V (ac) or 24 V (ac) Boiler circuit to terminals

Boiler — Boiler (18 and

19). The 370 closes a dry relay contact between these terminals when boiler operation
is required.

2

26

28

3

1

25

24

Com

1-2

Com

3-4

27

4

29

18 19

Boiler

20 21

DHW

Pmp / Vlv

22 23

DHW

DemDem

3

1

2

N

L

Sys

Pmp

Po

wer

4

Var.

Pmp

4

3

1 2

N

L

Sys

Pmp

Var.

Pmp

wer

Po

3

1

2

N

L

Sys

Pmp

Po

wer

4

Var.

Pmp

2

26

28

3

20

22 23

21

1

25

24

Com

1-2

Com

3-4

27

4

29

18 19

Boiler

DHW

Pmp / Vlv

DHW

DemDem

Installation