1 installation, 1 unpacking, 2 utilities / hook-up – Trebor PC7 User Manual

Page 3: Installation, Unpacking, Utilities / hook-up, 1installation

Advertising
background image

1

INSTALLATION

1.1 UNPACKING

After unpacking, the pump should be checked for any damage that may have
occurred during shipment. Damage should be reported to the carrier
immediately.

The following items should be included within the shipping container:

Qty

Item

Description

1

PC7F or PC7P

PC7 PUMP CONTROLLER

1

PC7-Manual

Manual, PC7 Pump Controller

1.2 UTILITIES / HOOK-UP

The controller can be mounted by any of three methods. It can be bolted to a wall
or deck using the snap on base slots as shown below using four ¼”(6mm) bolts
in the pattern shown below.

1 7/16"

1 7/16"

5/16" DIA

4X

1 7/8"

1 7/8"

MTD0616

BOLT PATTERN

BOLT PATTERN

CONTROLLER - BOTTOM VIEW

MTD0617

MTD0618

PUMP INSTALLATION - BACK

PUMP INSTALLATION - TOP

PC7 CONTROLLER OPERATION / MAINTENANCE MANUAL

PAGE 3

Advertising