05 connecting torch, 05 connecting torch -2 – Tweco Max 300 w-Merlin 6000GST User Manual

Page 20

Advertising
background image

INSTALLATION

3-2

Manual 0-2642

3.05 Connecting Torch

WARNING

Disconnect primary power at the source before dis-
assembling the torch or torch leads.

The Torch Leads connect directly to a bulkhead inside
the Arc Starter Box. Connect the Torch Leads per the fol-
lowing procedure:

NOTE

The Arc Starter Box must be installed in the sys-
tem according to the Arc Starter Box Instruction
Manual, 0-2654 supplied with the Arc Starter Box.

1. Remove the cover from the Arc Starter Box if in-

stalled.

2. Remove the tape securing the shield of the torch

leads to the leads.

3. Unfold the shield towards the end of the leads.

4. Feed the Control Cable through the boot on the

end of the Arc Starter Box.

5. Feed the torch leads through the boot on the torch

end of the Arc Starter Box.

A-01775

Torch Leads

Hose Clamp

Shield Braid

Torch Leads

Shield Assembly

(Brass Hub)

Control Cable

Figure 3-2 Hose Clamp

6. Feed the Control Cable and torch leads through

the supplied Hose Clamp.

7. Connect the Control Cable to the mating connec-

tor on the Center Chassis.

Control Cable

Control Cable

Connector

A-01774

Figure 3-3 Control Cable Connection

8. Connect the torch leads connectors to the bulk-

head connections per the following figure.

A-01776

Torch Leads

Secondary Gas

Plasma Gas

(Left-Hand Thread)

Coolant Supply

Coolant Return

(Left-Hand Thread)

Pre-Flow (N2)

Gas

Figure 3-4 Torch Leads Connections

9. Pull the shielding braid towards the end panel as

far as it will go up and over the brass hub. The
hub is part of the Boot Assembly and provides
the grounding point for the shielding in the torch
leads.

NOTE

The shielding braid must not make contact with
the four mounting studs.

Advertising