Installation, 1 unpacking, 2 equipment assembly – Tweco PAK 10 User Manual

Page 17

Advertising
background image

Manual No. 0-0515

5

Installation

INSTALLATION

2.1

UNPACKING

The PAK 10 is skid-mounted and protected with a car-
ton and padding material to prevent damage in ship-
ment. The casters, lifting eye, gas hoses, work cable,
torch, torch leads and miscellaneous parts are packed
separately.

One copy of the PAK 10 Instruction Manual, in a trans-
parent plastic envelope, is packed in with the PAK 10
unit.

3

5

4

1

2

6

7

8

A-03356

1. Washer-head cover screws

2. Cover Assembly

3. Lifting eye

4. Access door fasteners

5. Lead connection access door assembly

6. Interlock switch actuator

7. Casters

8. Work cable receptacle

Figure 2-A Power Supply and Control Unit with

Access Door Open

2.2

EQUIPMENT ASSEMBLY

After removing the carton, turn the lifting eye (3,
Fig. 2-A) all the way into the threaded socket on top
of the unit and tighten it securely. The lifting eye
may then be used to lift the unit for removal of the
skids and installation of the casters (7). If no crane
or hoist is available for lifting, a fork lift or jack may
be used. Use care so that the base of the unit will
not be damaged. Lift the unit and remove the two
skids which are secured to the base assembly with
four bolts and hex nuts. Install the two swivel cast-
ers (7) at the front of the unit using four 5/16-18 x
3/4 inch cap screws and four 5/16-18 locknuts in
each. Install the two fixed casters at the rear in the
same manner. Lower the unit onto the casters and
remove the lifting device.

Advertising