Parts lists, General arrangement – Tweco PAK 10 User Manual

Page 37

Advertising
background image

Manual No. 0-0515

25

Parts Lists

PARTS LISTS

General Arrangement

The Assembly Parts List consists of illustrated Parts
Lists of the following:

• Complete PAK 10 Cutting System

• Equipment Board Assembly

• Control P.C. Board Assembly

• Control Bridge & Main Bridge Assemblies

• Torch Connection Panel Assembly

• Pilot Resistor and Rear Panel Assembly

• Front Panel Components Assembly

• Base Components Assembly

• Leads and Leads Fittings, Remote Control Assem

bly, Leads Extensions, Torch Guide & Circle Cut
ting Attachment

• Series 4B Gas Cooled Torches

• Gas Pressure Regulators

An item number in parentheses indicates the item is
located behind the item pointed to. An asterisk beside
the item number indicates the part is a main assembly,
not a component. Parts listed without item numbers
are not illustrated, but may be ordered by the catalog
number shown.

ORDERING INFORMATION

When ordering replacement parts, order by catalog
number and complete description of the part or assem-
bly, as given in the description column of the Assem-
bly Parts List. In addition, give the model number of
the machine, the machine serial number and its oper-
ating voltages, as given on the plate attached to the front
panel of the power supply and control unit. Address
all inquiries to your authorized Thermal Dynamics’ dis-
tributor.

Advertising