02 preparations for operating, 02 preparations for operating -3 – Tweco FP-38 Power Supply User Manual

Page 21

Advertising
background image

Manual 0-2967

4-3

OPERATION

4.02 Preparations For Operating

At the start of each operating session:

WARNING

Disconnect primary power at the source before assembling or disassembling power supply, torch parts, or torch and
leads assemblies.

A. Torch Parts Selection

Check the torch for proper assembly and appropriate torch parts per the torch manual. The torch parts must
correspond with the type of operation, and with the amperage output of this Power Supply (30 amps maximum).
Use only genuine Firepower parts with this torch.

B. Torch Connection

Check that the torch is properly connected.

C. Check Primary Input Power Source

1.

Check the power source for proper input voltage. Make sure the input power source meets the power re-
quirements for the unit per Section 2, Specifications.

2.

Connect the input power cable (or close the main disconnect switch) to supply power to the system.

D. Gas Selection

Ensure air source meets requirements (refer to

Section 2). Check connections and turn gas supply on.

E. Connect Work Cable

Clamp the work cable to the workpiece or cutting table. The area must be free from oil, paint and rust. Connect
only to the main part of the workpiece; do not connect to the part to be cut off.

A-03387

Advertising