E Z T R A K

Document Number:

EZT1001

7

Document Title:

EZ Trak Installation and Operations Manual

5.

When all anchor bolts have been set, place one nut onto each of them,
and use the ratchet and socket to tighten it, until as many of the threads
from the bolts as possible are showing. There should also be sufficient
threads on the anchor bolts left to secure the plate in place with the
remaining 4 nuts. If this is not the case, the holes in the concrete were
drilled too deep, and the installer should use smaller, or no leveling nuts.

6.

Securely fasten the 4 nuts with the socket wrench. When this has been
successfully completed, there should be no movement in the EZ Trak
whatsoever.

NOTE: It is very important to allow at least 66” inches of wire to remain

draped over the top of the conduit, so that there is enough left to make all
of the electrical connections. It is also recommended that 3” or more of
conduit protrude the bottom of the terminal. This is to ensure that standing
water will not accumulate in the conduit.