VICI Two position Standard electric User Manual

Page 12

Advertising
background image

2.

Remove the CR2/clamp ring from the standoff and mount it on the oven
wall. (Screws are not provided for this purpose.) Slide the standoff through
the CR2/clamp ring on the oven wall or bracket. (The standoff requires an
11/16" clearance hole.)

3.

Firmly press the end of the standoff into the CR3/clamp ring mounted on the
actuator, making sure that the square driver of the actuator engages the
squared hole of the standoff drive shaft. Position the entire assembly so
that the entire valve body cutout is visible.

4.

Tighten the screw in the CR3/clamp ring.

5.

Align the valve and actuator according to the Alignment Procedure found
in Section 5.4.

CAUTION: If the valve and actuator are not properly aligned, the slots
on the valve rotor and the ports in the valve body will not align properly.
The flow of sample may be blocked, and other problems may result.

7.

Position the standoff in the CR2/clamp ring and tighten the clamp ring screw
to secure the standoff in place.

10

Advertising
This manual is related to the following products: