Wheatheart X13 Right Angle Drive Kit User Manual

Pre-installation

Advertising
background image

P

ART

N

UMBER

: 30795 R1

R

EVISED

: 23/11/12

Before starting installation:

• Familiarize yourself with all the required hardware.
• Arrange all parts for easy access.
• Refer to the X13 assembly and operating manual for assembly safety and

operating instructions.

PRE-INSTALLATION

To prepare auger for kit installation:
1. Park auger on level ground. Fully lower the auger tube scissor lift.
2. Chock auger wheels to prevent rolling.
3. Relieve pressure in hydraulic hose(s) and disconnect them from tractor.
4. Position the hitch jack to support auger intake, then unhook tractor from

auger.

5. Install support leg as shown in Figure 1.

Important: The pin must be placed through the auger hitch. Do not use support leg without

pin in place!
6. Remove hitch jack.
7. Remove sprocket guard from boot.
8. Remove CV-PTO Driveline from auger by driving out the PTO roll pin.

X13 RIGHT ANGLE DRIVE KIT [A267]

FOR X1374, X1384, & X1394 AUGER MODELS

INSTALLATION INSTRUCTIONS

Wheatheart

part of theAg Growth International Inc. Group

P.O. Box 39, Rosenort, Manitoba, Canada R0G 1W0 Ph: (866) 467-7207 Fax: (866) 768-4852

Website: www.wheatheart.com Email: [email protected]

© Ag Growth International Inc. 2013

Advertising