Wheatheart X13 1000RPM PTO User Manual

Auger preparation for kit installation

Advertising
background image

P

ART

N

UMBER

: 30788 R1

R

EVISED

: 23/11/12

We recommend that two or more people be present for this procedure.

Note: In this manual, left hand and right hand directions apply when looking at the boot

from the tow bar end.
Before starting installation:

• Familiarize yourself with all the required hardware.
• Arrange all parts for easy access.

Refer to the X13 assembly and operating manual for assembly safety and

operating instructions.

AUGER PREPARATION FOR KIT INSTALLATION

Note: When installing kit during assembly of a NEW auger, steps 1-10 may not apply.

1. Lower auger to full down position.
2. Chock auger wheels to prevent rolling.
3. Remove tractor from auger.
4. Lower swing hopper fully to the ground.
5. Support auger boot securely with front end loader and strong sling or chain,

or with block and tackle.

6. Remove PTO driveline from auger.
7. Loosen bolts and nuts, remove PTO saddle bracket from boot.
8. Remove sprocket guard from boot.
9. Remove sprockets, bearing, and lock collar from boot.
10. Loosen bolts and nuts, remove bearings and washer from boot.

Note: Don't remove the square keys from the flighting or top gearbox shaft. Make sure

there is nothing left on the boot face. See Figure 1.

X13 1000 RPM PTO DRIVE KIT [A262]

FOR X1374, X1384, & X1394 AUGER MODELS

INSTALLATION INSTRUCTIONS

Wheatheart

e

part of th Ag Growth International Inc. Group

P.O. Box 39, Rosenort, Manitoba, Canada R0G 1W0 Ph: (866) 467-7207 Fax: (866) 768-4852

Website: www.wheatheart.com Email: [email protected]

© Ag Growth International Inc. 2013

Advertising
Table of contents