Operation, Pre-operational checklist, Auger drive and lockout procedure – Wheatheart Galvanized 4 Utility Auger User Manual

Page 17: Operating procedure, Start-up and break-in

Advertising
background image

W

HEATHEART

- G

RAIN

A

UGERS

4. O

PERATION

4" G

ALVANIZED

U

TILITY

4.1. P

RE

-O

PERATIONAL

C

HECKLIST

30645 R0

17

4. Operation

Operators must observe safety procedures at all times and follow the pre-opera-
tional checklist before each start-up.

4.1. PRE-OPERATIONAL CHECKLIST

Before operating auger each time, the operator must confirm the following:

• All fasteners are secure as per assembly instructions.
• Drive belt(s) are not frayed or damaged.
• Drive belt(s) are properly adjusted and aligned.
• Tube alignment is reasonably straight.
• Intake area and discharge spout are free of obstructions.
• Proper maintenance has been performed.
• Inspect auger supports frequently.

4.2. AUGER DRIVE AND LOCKOUT PROCEDURE

4.3. OPERATING PROCEDURE

4.3.1. S

TART

-U

P

AND

B

REAK

-

IN

B

REAK

I

N

1. Complete

the

checklist

at the beginning of this chapter. If everything is

satisfactory, prepare for a 30-minute operation at half speed.

2. Correctly position the portable grain hopper secure it to auger with both

straps (where applicable).

Warning: Before continuing, please reread the safety information relevant to this section at
the beginning of this manual. Failure to follow the safety instructions can result in serious
injury, death, or property damage.

Drive Type

Before Operation

Lockout

Electric Motor

Before starting motor, ensure

• motor is properly

grounded

• pulley shields are in

place and secure

The electric motor should be equipped with a
main power disconnect switch capable of
being locked in the off-position only. The
switch should be in the locked position during
shutdown or whenever maintenance is
performed on the auger.

• If reset is required, disconnect all power

before resetting motor.

Advertising