Assembly – Great Plains Seed-Lok User Manual

Page 2

Advertising
background image

2

Row Unit 1999 Seed-Lok Option 404-090M

4/8/04

Great Plains Mfg., Inc.

Assembly

4.

Place spring (1) over recessed end of
lock rod (2).

5.

Install lock rod through hole in top of row-
unit body, with spring at top. Assemble le-
ver (1) onto top of rod with cotter pin (2).

18102

18101

1

2

1

2

Advertising