Great Plains Full Press Drill Post Conversion User Manual

Page 3

Advertising
background image

4/9/2004

104-010M

Great Plains Mfg., Inc.

3

Installation Instructions

Refer to Figure 3

10. Center the spindle hub assembly (1) on the

square tube where the saddle cut was made.
Position the hub so the top edge is raised 1/4"
above the top surface of the tube. Make sure
the centerline of the hub is 13 7/8" from the
front surface of the square tube.

11. Clamp the spindle hub assembly (1) in place

and make sure it is plum with the upright
square tube (2). Clamp only to the outside of
the hub.

Note: Make sure the measurements are accurate
and the hub is plum with the tube. Securely clamp
the hub in place before welding.

12. Cover the openings of the spindle hub assem-

bly (1) so not to allow any welding sparks or
beads to get inside. This is necessary in order
to protect the bearing cups on the inside of
the hub.

13. Weld the spindle hub assembly (1) in place

using a weld with high tensile strength.

Refer to Figure 4

14. If you are reusing the pivot post (1) it will be

necessary to remove the old pivot bracket (2).

15. After removing old bracket (2) smooth the sur-

faces of the pivot post (1).

20226

Figure 3

Spindle Hub Assembly

Figure 4

Pivot Post

20227

Advertising