Point planter installation instructions – Great Plains 8030-3P 3-Point Planters User Manual

Page 8

Advertising
background image

3-Point Planter Flat Fold Marker 113-478M

4/9/04

6

Great Plains Mfg., Inc.

Section 2 Assembly Instructions & Set-Up

3-Point Planter
Installation Instructions

NOTE: While using the following text to install your
flat fold marker, you may need to refer to the parts
section of this manual for more details and for posi-
tive identification of related items not mentioned in
these instructions.

Refer to Figure

2-1 for the following Installation

Instructions.

1.

Lower the planter to the planting position. Remove
the frame end cap if applicable.

2.

Install all hydraulic hoses to valve (#3 & 4). Install
the valve and marker hoses to the center mast of the
frame (#5, 6, 7, & 8). Mark the hoses that are at-
tached to C1,C2,R1,and R2 ports. (Masking tape at-
tached to cylinder end of the hose is adequate.)
Feed the cylinder end of the hoses into the frame
making sure C1 and R1 go to the left end of the
frame And that C2 and R2 go to the right end of the
frame. When the hoses are completely installed
there will be excess hose that will be tucked back in-
side the frame when the cylinder and mount are in-
stalled.

3.

Install the fittings (#2) into the cylinders noting that
the elbows will point to the base ends of the cylin-
ders. Install the hoses (#3) marked C1 and C2 to the
rod end of the cylinders and the hoses marked R1

12023

Hose Routing

Figure

2-1

Advertising
This manual is related to the following products: