Test installation, Test fold – Great Plains NP4000 Applicators User Manual

Page 14

Advertising
background image

14

Great Plains Manufacturing, Inc.

Front Page

Appendix

Spring Plunger Update

401-828M

Front Page

Appendix

2012-08-30

Test Installation

Test Fold

The applicator is presumed to be raised.

Refer to Figure 21
72. Swing the standard cylinder stop channels

fully

open.

73. Swing each spring plunger assembly

up off the

valve. Swing the channel and plunger up off the rod,
and rest it on the holder

. Pin the channel handles

(not the plunger handle) in the holder.

This is the transport configuration for the plunger
and cylinder stop channel.

74. Check that all hydraulic connections are made and

that connectors were torqued to specification.

75. Hitch the applicator to a suitable tractor, including all

hydraulic connections.

76. For the fold circuit, slowly move the tractor handle to

Retract. As the wings just begin to move, set the
circuit to Neutral. Inspect for leaks

Refer to Figure 22
77. Resume circuit retraction until the wings are fully

folded. Consult the Operator manual for illustrations
of correct sequence. When the wings reach the
supports, set the circuit to Neutral. Make another
inspection for leaks.

78. Install the wing lock pins (not shown, see Operator

manual).

Figure 21

Ready for Fold

34106

56

7

U

D

R

L

F

B

53

7

56

53

Figure 22

Transport Configuration

34107

U

D

R

L

F

B

Advertising
This manual is related to the following products: