Riser pipe assembly, Caution, Approval signature date phone no – Amico Ceiling Column Motorized Retractable User Manual
Page 10
NOTE:
1.
“X” represent US/ISO and GAS type
i.e:
C-PIPE-CHK-U-AIR
2.
3/8” [9.97mm] ID 1/2” [12.7mm] OD Type “K” Copper
Pipe
C-PIPE-CHK-X-OXY
C-PIPE-CHK-X-XXX (AIR, N2O, CO2, NIT)
C-PIPE-CHK-X-VAC
C-PIPE-CHK-X-IAR
C-PIPE-CHK-X-XXX (WAGD, AGSS)
C-CHKVLV-OXY
C-CHKVLV-GAS
C-CHKVLV-VAC
C-CHKVLV-EVA
C-CHKVLV-IAR
1/4”
[6.35mm]
3/16”
[4.76mm]
3/16”
[4.76mm]
7/32”
[5.56mm]
1/4”
[6.35mm]
(OXYGEN)
(AIR, N
2
0, CO
2
& NIT)
(VACUUM)
(EVACUATION)
(INSTRUMENT AIR)
Riser Pipe Assembly
Yes (Amico provides termination box - default)
No (Termination box will be supplied by others)
CAUTION
Before brazing the Riser an intermittent blow-out purge
is required to be done until all debris are cleared from
the Pipeline System.
Installations of the Riser should be done in accordance
with current NFPA 99 and CSA Z7396.1.
Risers with Demand checks should avoid excess or direct
heat near its brass end.
*
*
*
Approval Signature
Date
Phone No.
10
Amico Pipeline