Riser pipe assembly, Caution, Approval signature date phone no – Amico Ceiling Column Motorized Retractable User Manual

Page 10

Advertising
background image

NOTE:

1.

“X” represent US/ISO and GAS type

i.e:

C-PIPE-CHK-U-AIR

2.

3/8” [9.97mm] ID 1/2” [12.7mm] OD Type “K” Copper

Pipe

C-PIPE-CHK-X-OXY

C-PIPE-CHK-X-XXX (AIR, N2O, CO2, NIT)

C-PIPE-CHK-X-VAC

C-PIPE-CHK-X-IAR

C-PIPE-CHK-X-XXX (WAGD, AGSS)

C-CHKVLV-OXY

C-CHKVLV-GAS

C-CHKVLV-VAC

C-CHKVLV-EVA

C-CHKVLV-IAR

1/4”

[6.35mm]

3/16”

[4.76mm]

3/16”

[4.76mm]

7/32”

[5.56mm]

1/4”

[6.35mm]

(OXYGEN)

(AIR, N

2

0, CO

2

& NIT)

(VACUUM)

(EVACUATION)

(INSTRUMENT AIR)

Riser Pipe Assembly

Yes (Amico provides termination box - default)

No (Termination box will be supplied by others)

CAUTION

Before brazing the Riser an intermittent blow-out purge
is required to be done until all debris are cleared from
the Pipeline System.

Installations of the Riser should be done in accordance
with current NFPA 99 and CSA Z7396.1.

Risers with Demand checks should avoid excess or direct
heat near its brass end.

*

*

*

Approval Signature

Date

Phone No.

10

Amico Pipeline

Advertising