Edge Lighting 2 Circuit Standoffs User Manual

Monorail 2 circuit 1" rigid standoff, Install the standoff, Installation instructions for

Advertising
background image

SAVE THESE INSTRUCTIONS!

M2S-1-_

- This product is ETL listed for indoor dry locations.
- The product is intended to be used with Edge Lighting
Monorail 2 circuit systems only.
- Use Monorail 2 circuit standoffs where the Monorail 2
Circuit sections join together and approximately every 3
feet throughout the Monorail 2 Circuit run.

Monorail 2 Circuit 1" Rigid Standoff

Installation Instructions for

1

904-M2S-1-02

IMPORTANT INFORMATION

1718 W. Fullerton Ave

Chicago, IL 60614

Tel: 773-770-1195

Fax: 773-935-5613

www.edgelighting.com

[email protected]

A

Install the Standoff

B

1: Hold the Monorail 2 Circuit section against the ceiling or use
a plumb bob to mark the standoff locations onto the ceiling
(this may require more than one person).

2: Tap the anchors onto the marked locations up to the
threaded portion with a hammer.

3: Screw the threaded portion of the anchors in with a Phillips
screwdriver.

ANCHOR

CEILING

2

3

4: Mount the standoffs onto the anchors with the #8 screws
provided. Make sure that the cut out portion of the
standoffs lines up with the Monorail.

#8 SCREW

1" STANDOFF

4

4

C

5: Slide Monorail into the cut out portion of the standoffs. Hold
the Monorail against the standoffs (

and tighten the M3 set screw on each

standoff with the 1.5mm Allen wrench.

this may require more

than one person)

MONORAIL
2 CIRCUIT

1.5MM ALLEN
WRENCH

M3 SET
SCREW

5

© 2009 Edge Lighting. All Rights Reserved.

Advertising
Table of contents