Edge Lighting Taos Square LED User Manual

Page 2

Advertising
background image

C

FIXTURE BODY

2MM ALLEN WRENCH

CANOPY

M4 SET SCREW

7: Loosen the two M4 set screws on the fixture body (Do
Not Remove)
with the provided 2mm Allen wrench and
carefully pull the canopy off of the fixture body.

E

10: Connect the red fixture wire to the red LED driver wire (+)
with a wire nut.

11: Connect the black fixture wire to the brown LED driver wire
(-) with a wire nut.

2

12: Place all wires and wire nut connections inside the fixture
body. Slide the fixture body completely onto the canopy and
tighten the two M4 set screws with the 2mm Allen wrench.

13: For installation in wet location, caulk around the fixture
canopy with waterproof construction sealant.

NOTE:

The fixture contains two 3 watt integrated LED lamps.

These lamps are rated for 40,000 hours.

F

M4 SET SCREW

12

FIXTURE
BODY

CANOPY
BRACKET

13

8: Feed the LED brown and red driver wires through the canopy
center hole, washer, and nut provided.

9: Slide the canopy back onto the crossbar assembly nipple
(make sure the gasket is in place) and secure the canopy to
the crossbar assembly by tightening the nut.

D

CANOPY
CENTER HOLE

LED DRIVER
WIRE

9

NUT

WASHER

8

9

7

10

11

8

Advertising