Edge Lighting Cirrus Channel, Wall Grazer User Manual

Page 3

Advertising
background image

3

MOUNTING
CLIP (C-MCL)

LOCKING CLIP

10

CHANNEL

10: Carefully snap channel onto the locking/mounting clips
then slide 2" into receiving bracket to lock in place. Make
sure not to nick the wires.

11: If applicable, connect the remaining channels by following
"Connecting the Channel" on page 1. Then secure by
repeating step 10 (above).

BACK OF CHANNEL

RECEIVING BRACKET

LOCKING
CLIP

I

J

12: Place each canopy piece against the channel & line up the
canopy hole with the crossbar hole. Secure the canopy in
place with the screw & Allen wrench provided.

CHANNEL

SCREW

CANOPY

12

12

ALLEN
WRENCH

Install the Channel using the
Junction Box (C-1RE-JBOX)

K

2

3

1

2

3

1

JUNCTION
BOX

MOUNTING
BRACKET

1: Mount each adjustable mounting bar to one side of the
junction box (mounts to any side of the housing depending
on the orientation of the channel) and secure them with the
mounting brackets and two Phillips screws provided.

ADJUSTABLE
MOUNTING BAR

PHILLIPS
SCREW

1

VERTICAL

ORIENTATION

HORIZONTAL

ORIENTATION

1

JUNCTION
BOX

2

3

1

2

3

1

STUD

ADJUSTABLE
MOUNTING BAR

#8 SCREW

L

2

4

4

4

4

JUNCTION BOX

2:
box to be mounted.

3: Place the adjustable mounting bars between the studs.

4: Make sure the lips on the adjustable mounting bars are
against the studs. Secure the adjustable bars to the
studs with the eight #8 screws.

Select the location between the two studs for the Junction

NOTE:

The adjustable mounting bars mount to studs that are

spaced 16" to 24" apart.

Advertising