Edge Lighting Reveal, 24VDC Plaster-In LED System User Manual

Page 2

Advertising
background image

2

8: Mark a location on the drywall where the junction box will
be located.

9: Trace the drywall cutout template onto the drywall at
the junction box location.

10: Remove drywall cutout template and cut out the
marked area using a "Rotozip” tool.

E

2.80"

2.25"

3.00"

1.06"

0.35"

DRYWALL CUTOUT

TEMPLATE

DRYWALL

8

12: Using the drywall opening as reference, mark 2.25" wide
lines the complete length of the channel along the drywall.

13: Cut out the mark line on the drywall.

G

14: Mark the location to the studs for future reference.

CLOSE UP

DRYWALL
OPENING

JUNCTION
BOX SLOT

CHANNEL
START

STUD

MARKING

LENGTH OF CHANNEL

13

121

12

14

2.25" CUTOUT

ROTOZIP

9

DRYWALL

CUTOUT

TEMPLATE

10

11:Install the drywall.

F

15: Remove one included power feed end cap from the
channel end opposite the junction box.

H

POWER FEED
END CAP

REVEAL
CHANNEL

SCREW

15

POWER FEED
END CAP

CONDUIT

JUNCTION BOX

STUD

11

Advertising