Power the puck lights, Typical wiring diagram – Edge Lighting Puck LED User Manual
Page 2

2
Power the Puck Lights
1: Mark the location where the hub is going to be installed.
2: Use a 1/16" drill bit to drill pilot holes on marked locations.
3: Mount the hub to the pilot holes with the three Phillips
screws provided.
4: Connect the AC Power cord into the single port of the hub.
5: Connect each LED Puck AC cord into one port.
6: Use the provided clips to manage the Pucks and Hub cords.
7: Connect the Hub AC power cord to the 12 volt power supply
wires. Refer to the instructions provided with the power
supply.
C
CLIP
CORD
6
HUB
3
PHILLIPS
SCREW
3
LED PUCK AC CORD
4
5
NOTE:
of 3 watts.
Each Puck contains three 1 watt LEDs consuming a total
AC POWER CORD
POWER
SUPPLY
HUB
7
TYPICAL WIRING DIAGRAM
WHITE(NEUTRAL)
RECTANGLE
ELECTRICAL BOX
HUB-4P
BLACK (HOT)
120VAC
ELECTRONIC LOW VOLTAGE
DIMMER OR SWITCH
TE-60L-12AC-3RE-WH
RECTANGLE
CANOPY COVER
(3RE-WH)
TE-60L-12AC
6FT
12VAC
8FT
PUCK LED CABINET LIGHTING. 3W PER FIXTURE
EDGE # PUCK-RD-3W-90D-30K-SA