13: Mark the area where the channel will be located on the
drywall using the junction box opening as a guide (MIN 2.25"
wide).
14: Cut out the marked area(s) using a Dremel Multi-Max or a 6"
Fixed Jab Saw.
15: Mark the location of the studs to the drywall for future
reference.
NOTE: To install channel vertically or in a wall without standard-
spaced studs, install perforated mounting straps every 32"
behind drywall and secure using two drywall screws. Mark the
location of any mounting straps to the drywall.
MARKING
STUD
MOUNTING
STRAP
6" FIXED
JAB SAW
12: Mark location of junction box. Cut out drywall to expose
junction box using a 6" Fixed Jab Saw or equivalent tool.
2.25"
16: Connect the red power supply (24VDC+) wires to each red
power wire with a wire nut inside the junction box.
17: Connect the black power supply (24VDC-) wires to each black
power wire with a wire nut inside the junction box.
18: Place the wire nut connections inside junction box.
JUNCTION BOX
POWER
WIRE
16
17
2.25"
19: Insert the 90° joiner bracket halfway into the mitered channel
corner. Tighten the two M4 set screws on each joiner bar with a
1.5MM Allen wrench.
12
13
14
15
19
Z23
Z24
Z25
Z26
90° JOINER
BRACKET