Testing — reduced pressure zone assemblies, Servicing relief valve, Test no.1 – Ames Fire & Waterworks LFM500, LFM500N, LFM500Z Lead Free Stainless Steel Reduced Pressure Detector Assemblies User Manual

Page 5: Test no. 2, Test no. 3, Test no. 4

Advertising
background image

5

Test No.1

Purpose: To test check valve No. 2 for tightness against
reverse flow.
Requirements: Valve must be tight against reverse flow under
all pressure differentials. Slowly open the ‘high’ valve A and
the ‘vent’ valve C, and keep the ‘low’ valve B closed. Open
test cock #4. Indicated pressure differential will decrease
slightly. If pressure differential continues to decrease (until the
vent opens) check valve #2 is reported as ‘leaking’.

Test No. 2

Purpose: To test shutoff #2 for tightness.
Requirements: After passing Test No. 1, continue to Test No.
2 by closing test cock #2. The indicated pressure differential
will decrease slightly. If pressure differential continues to
decrease (approaching ‘zero’), shutoff #2 is reported to be
‘leaking’.

Test No. 3

Purpose: To test check Valve No. 1 for tightness.
Requirements: Valve must be tight against reverse flow under
all pressure differentials. Close ‘high’ valve A and open test
cock #2. Close test cock #4. Disconnect vent hose at test
cock #4. Open valves B and C, bleeding to atmosphere.
Then closing valve B restores the system to a normal static
condition. Observe the pressure differential gauge. If there is a
decrease in the indicated value, check valve No. 1 is reported
as ‘leaking’.

Test No. 4

Purpose: To test operation of pressure differential relief valve.
Requirements: The pressure differential relief valve must
operate to maintain the ‘zone’ between the two check valves
at least 2psi less than the supply pressure. Close ‘vent’ valve
C. Open ‘high’ valve A. Open the ‘low’ valve B very slowly until
the differential gauge needle starts to drop. Hold the valve at
this position and observe the gauge reading at the moment the
first discharge is noted from the relief valve. Record this as the
opening differential pressure of the relief valve.

NOTICE

It is important that the differential gauge needle drops slowly. Close
test cocks #2 and #3. Use ‘vent’ hose to relieve pressure from test
kit by opening valves A, B and C Remove all test equipment and
open shutoff #2.

Testing — Reduced Pressure Zone Assemblies

Ball Type Test Valves

A

C

B
Needle
Valve

High Hose

(Yellow)

Low Hose

(White or Red)

Vent Hose

(Blue)

Test Cock Test Cock Test Cock Test Cock

No. 1

No. 2

No.3

No.4

Servicing Relief Valve

Prior to servicing the relief valve, it is mandatory to shut down

water system by closing both the inlet and outlet shutoff

valves and relieving pressure within the assembly by opening

the #2, #3 and #4 test cocks.
DO NOT REMOVE SPIDER BUSHING FOR SERVICING

1.  Disconnect the hose from the bottom cover plate to the

relief valve.

2.  An O-ring seals the relief valve body to the main housing. It

is not necessary to tighten the connection beyond firm hand
tightening. The relief valve should be able to be removed by
hand untightening. Unscrew the relief valve from the hous-
ing.

3.  Remove the cover plate of the relief valve by removing the

four connecting screws.

4.  Remove the rubber diaphragm from the relief valve. Be

aware of how the diaphragm is configured so that it can
be reinstalled in the same manner. The hard rubber tab in
the diaphragm fits into a similar socket in the head of the
piston. (Figure 1)

Figure 1

Figure 2

5.  Hold the relief valve in both hands with the threaded end

up and both thumbs on the head of the piston. Push up on
the piston until the piston shaft with the attached E-clip is
exposed. Remove the E-clip (Figure 2)

6.  Remove the piston and spring from the relief valve hous-

ing and thoroughly clean all parts including the diaphragm.
Inspect all rubber parts for damage and if damaged, replace
them with new parts.

7.  Reassemble the relief valve in the reverse order that it

was disassembled.