1-28

Rack Installation Guide

Figure 1-17.

Rotating the Front Mounting Bracket for Flush-Mount Installation

6

Repeat steps 4 and 5 to configure the other slide assembly.

7

Holding the left slide assembly into position in the two-post rack at the location you marked,
adjust the extended back bracket tightly against the vertical two-post rack and secure it with
four 12-24 x 0.5-inch pan-head Phillips screws (see Figure 1-18).

8

Secure the front bracket on the slide assembly to the two-post rail with four 12-24 x 0.5- inch
pan-head Phillips screws (see Figure 1-18).

NOTE:

Use all four screws to ensure that the bracket is securely attached to the rail.

9

Perform steps 7 and 8 to install the right slide assembly in the rack.

nut (2 per bracket)

mounting flange

shoulder washer (2 per bracket)

screws (2 per bracket)