Installation tasks, Recommended tools and supplies, Rapidrails rack kit contents – Dell PowerEdge 6950 User Manual

Page 10

Advertising
background image

8

Dell™ Rack Installation Guide

Installation Tasks

Installing a rack kit involves performing the following tasks in their numbered
order:

1 Marking the rack (if necessary)
2 Installing the rail assemblies in the rack:

RapidRails installation

VersaRails installation

3 Installing the system in the rack
4 Installing the cable tray and cable-management arm
5 Routing cables

Recommended Tools and Supplies

A #2 Phillips screwdriver

Masking tape or a felt-tip pen, for use in marking the rack mounting holes
to be used

A measuring ruler or tape measure

RapidRails Rack Kit Contents

The RapidRails rack kit includes the following items (see Figure 1-1):

One pair of RapidRails slide assemblies

One cable-management arm

One cable-management arm retainer

One cable tray

One status indicator cable (if applicable)

One Velcro cable strap

Advertising