Condensing section must be located in same plane as, or

above, evaporator section to maintain the liquid refrigerant seal

at the expansion device. This permits expansion device to feed

liquid refrigerant to evaporator coil properly. To split sections

(some of the following steps may be eliminated depending on

particular application):

1. Disconnect all electrical power to unit.
2. Remove the 10 size 10 drive screws that hold on the top

tie strap.

3. Remove the 8 size

3

/

8

-in. drive bolts that hold on each

side angle.

4. Control panel access panels are held on with 2 size 10

drive screws for each panel. A standard 50AH024-060

unit has one control panel located in the evaporator sec-

tion. A standard 50AH072 or 096 unit has a control panel

in both the evaporator and condenser sections.

5. Units have resealable fittings. Do not cut refrigerant pip-

ing. See Interconnecting Refrigerant Tubing section be-

low for procedure on installing tubing.

6. Install evaporator and condensing sections in desired

locations.

7. Use sufficient length of refrigerant piping to reconnect

piping cut in previous step. Refer to Carrier System

Design Manual, Part 3, for additional piping data.

8. Recharge unit with R-410A. See Refrigerant Charge sec-

tion on page 18 for more information.

After splitting sections, additional refrigerant must be added

to system to ensure proper refrigerant charge. The amount of

refrigerant to be added depends on length of tubing added to

system and operating temperatures of system. Refer to Carrier

System Design Manual, Chapter 3. Allow unit to operate at

least 10 minutes before adjusting refrigerant charge.

Since standard roomtop unit has negligible line losses, split-

ting the system can increase line loss and decrease system

capacity. Capacity reduction can be determined by referring to

Carrier System Design Manual.
INTERCONNECTING REFRIGERANT TUBING — The

interconnecting tubing kit comes with all factory-optional split-

table units. After the separated sections have been installed, the

interconnecting tubing can be run, using the self-sealing cou-

plings supplied in the interconnect tubing kit (see Fig. 7 and 8).

For dual circuits, 2 kits are supplied. It is recommended that

some refrigerant oil be placed on the coupling threads to facili-

tate threading.

Perform the following procedure:

1. For condensing section, hand thread the female halves of

the self-sealing couplings (supplied with the interconnect

tubing kit) onto the male couplings (factory supplied and

installed on the condensing section). Turn union nut ap-

proximately 1 to 1

1

/

2

turns. This is to make sure that the

interconnecting tubing will be routed and brazed with the

self-sealing couplings in their final proper location, so

that there will be no difficulty when the final coupling as-

sembly is made.

2. For evaporator section, hand thread the male halves of the

self-sealing couplings (supplied with the interconnect

tubing kit) onto the female couplings (factory supplied

and installed on the evaporating section). Turn union nut

approximately 1 to 1

1

/

2

turns. This is to make sure that the

interconnecting tubing will be routed and brazed with the

self-sealing couplings in their final proper location, so

that there will be no difficulty when the final coupling as-

sembly is made.

3. Run the interconnecting tubing required.

NOTE: Installations may be made with up to 50 ft equiv-

alent line lengths by installing the recommended tube siz-

es and adding the necessary refrigerant. For equivalent

line lengths greater than 50 ft, contact Carrier for line siz-

ing and additional accesories required.

4. The interconnect tubing kit contains a sufficient number

of Schrader access valves to permit installation of one in

each end of both the liquid and suction lines of the field-

supplied tubing. Each interconnecting line (suction, liq-

uid, hot gas) must have one of the supplied Schrader ac-

cess fittings installed into the field-supplied tubing, how-

ever, for short lengths of tubing, only one Schrader in

each line is necessary. Install the Schrader valve fittings

into the tubing before brazing the couplings onto the ends

SELF-SEALING
COUPLING
(FEMALE HALF)

SELF-SEALING
COUPLING
(MALE HALF)

SELF-SEALING
FLANGE

SCREWS

Fig. 7 — Self Sealing Coupling

a50-8551

IMPORTANT: On units with more than one refrig-

erant circuit, be careful not to intermix lines of the

various circuits. If the connections were labeled

before disconnecting the couplings, this should not

be a problem. Half couplings may be removed to

make brazing to the interconnecting tubing more

convenient.

CAUTION

When brazing tubing to the self-sealing couplings, be sure

to use a wet rag, running water bath or chill blocks on the

quick-connects to prevent overheating the valves and dam-

aging the seals

.

EVAPORATOR
SECTION

A

A

C

C

C

C

D

D

D

D

B

B

A

A

CONDENSING
SECTION

A — Male self-sealing fittings
B — Refrigerant piping between sections
C — Female self-sealing fittings
D — Schrader fittings

Fig. 8 — Tubing Installation

a50-8552