42 gw, Motorized valve and control, Electrical connections – Carrier 42GW User Manual

Page 12: Standard version unit - control panel, Gb - 11

Advertising
background image

GB - 11

42 GW

E N G L I S H

Motorized valve and control

• If these connections are not made as described the drain

pan condensate may overflow.

• Valves should only open when the fan motor is working, i.e.

when one of TB1 terminals 1 or 2 or 3 is supplied from TB1
terminal 4.

• The optional electric heater (mod. 42GWE) which can only be

factory installed, must only be energized when the fan is
working.

• The optional electric heater which must be factory installed on

model 42GWE, works only if TB1 terminals 5-6 are supplied
from TB1 terminal 4.

• The water discharge pump should work every time the

cold water valve is opened, supplying TB1 terminal 7 and
8 from TB1 terminal 4.

• When the system is filled with water, verify all couplings

for tightness.

• The manufacturer does not accept responsibility for the

tightness of the field - installed valve assembly and this
is not tested in the factory. He declines any responsibility
for non functioning of these assemblies and for damage
due to dripping.

Electrical connections

ቢ

Capacitor

ባ

Ground connection screw

ቤ

Board

ብ

Relay board E-HTR (only on
models with electric heater)

ቦ

Holes for panel fixing screws

ቧ

Auxiliary board (accessory)

ቢ

ባ

ቤ

ብ

ቦ

C

B

A

CV

CG

CP

ቧ

STANDARD version unit - Control panel

CV

CG

CP

ቤ

ባ

C

ቢ

ቦ

ብ

A

B

ቧ

A. Electric heater supply connection

B. Unit power supply connection

C. Polarised connector

mod. 004 - 008 - 010

mod. 012 - 016 - 020

CV

CG

CP

Fan connector

Float connector

Pump connector

We recommend to remove the main board from the electric
panelboard for better access to electric connections.

Advertising