Ups initial startup – Dell UPS 1920T User Manual

Page 22

Advertising
background image

22

|

Installation

UPS Initial Startup

To start up the UPS:

1

Verify that the internal batteries are connected.

2

If an optional EBM is installed, verify that the EBM is connected to the UPS.

3

Verify that the power input to the UPS has adequate upstream overcurrent protection:

Table 1. Minimum Upstream Circuit Breaker Rating

UPS Output Power

120V

208V

230V

500W

15A

15A

1000W

15A

15A

1500W (at 100V)

1920W

20A

15A

The power cord current ratings are listed in Table 2.

Table 2. Power Cord Ratings

Dell UPS Model and Voltage

Power Cord

Rating

Country

Supplied Cord Set

500W and 1000W

100V

JIS C8303 to C13

12A

Japan

Optional

500W and 1000W

120V

NEMA 5-15P to C13

15A

North America

Yes

CNS 10917-2 to C13

15A

Taiwan

Optional

C13 to C14 Jumper

12A

Japan

Optional

NBR 14136 to C13

10A

Brazil

Optional

NBR 6147 to C13

10A

Brazil

Optional

Advertising