Installation, Unpacking the aggregator, Unpacking steps – Dell PowerEdge FX2/FX2s User Manual

Page 8

Advertising
background image

4

Installation

This switch installation procedure assumes that the Dell PowerEdge FX2 server chassis is installed
correctly. For complete installation instructions, refer to the Dell PowerEdge FX2 server chassis
Installation Guide
.

• AC/DC power cord — The cord reaches from the power outlet to the Utility-panel connector.
• Cabling — The cabling is routed to avoid sources of electrical noise such as radio transmitters,

broadcast amplifiers, power lines, and fluorescent lighting fixtures.

• Airflow — The airflow around the switch and through the vents is unrestricted.

Unpacking the Aggregator

When unpacking the Aggregator, ensure that the following items are included:

• One FN I/O Aggregator
• One USB type A-to-DB-9 female cable
Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information
Software License Agreement

Unpacking Steps

NOTE: Before unpacking the Aggregator, inspect the container and immediately report any

evidence of damage.

1.

Place the container on a clean, flat surface and cut all straps securing the container.

2.

Open the container or remove the container top.

3.

Carefully remove the switch from the container and place it on a secure and clean surface.

4.

Remove all packing material.

5.

Inspect the product and accessories for damage.

8

Installation