Hedv sequence of opera tion, Page 13 – Louisville Tin and Stove HEDV254A User Manual

Page 13

Advertising
background image

Page 13

Pressure switch

closes proving

inducer

Heater

in

stand-

by

Thermostat

calls for

heat

Power

on to

draft

inducer

Pressure

switch

closes

inducer

proved

Spark

ignition

ener

gized

Gas

valve

opens

gas

flow to

burner

Burner

flame

proved

Blower

on

Heat

cycle

Thermostat

satisfied







Gas

valve

closes

gas flow

to burners

of

f

Draft

inducer

of

f

Blower

of

f

Heater

in

stand-

by

Inducer

continues to

run

One Hour

Lock Out

15 Sec.

inter

purg

e

3

Attempts

for ignition

30 Sec.

180 Sec.

90 Sec.

4 Sec.

NO

NO

YES

YES

NO

NO

YES

YES

STEP #

1)

Thermostat calls for heat.

2)

Draft Inducer turns on.

3)

Pressure switch closes.

4)

Spark ignition begins.

5)

Gas flow to burner

.

6)

Burner ignition proven.

7)

Circulating Blower on.

8)

Heater burns through heating cycle.

9)

Thermostat satisfied.

10)

Gas flow of

f to burner

.

1

1

)

Draft inducer of

f.

12)

Circulating Blowers of

f.

13)

Heater in stand-by

.

NOTE: IF

THERE IS

A

MALFUNCTION IN STEPS 3, 5, 6

THE OPERA

TION SEQUENCE

WILL

ST

O

P

A

T

THA

T

POINT

. FOR STEPS 5 OR 6, IF

AFTER 2

ADDITIONAL

A

TTEMPTS MALFUNCTION STILL

OCCURS,

THE

CONTROL

WILL

LOCK OUT

FOR ONE HOUR. FOR PURPOSE OF

TESTING

,

THE ONE HOUR LOCKOUT

CAN

BE OVERRIDDEN BY

RESETTING

THE

THERMOST

A

T

OR INTERRUPTING

THE ELECTRICAL

POWER.

HEDV

SEQUENCE OF OPERA

TION

Advertising
This manual is related to the following products: