work into place along the
fillers, start at one end and
Note: When attaching pocket
CONTINUOUS POCKET
Prestage necessary tools and materials in the work area. Prepare all head,
sill, and jamb substrates by cleaning and setting all flashings and/or
membrane seals as specified by the project shop drawings.
Insert the mullion and/or head anchor, as specified by the project
shop drawings, into the end of tubular mullions. For splice joints and floor
anchors at multispan conditions, refer to steps #2 and #3 on pages 4
SEE APPROVED
SHOP DRAWINGS
FOR DIMENSION.
PERIMETER WITH
FILLER
and 5.
remaining length.
SIZE AND LOCATE ALL
BOLTS BASED ON JOB
CONDITIONS AND STRUCTURAL
REQUIREMENTS.
SHIM UNDER VERTICAL
MULLION.
MULLION ANCHORS
AT HEAD CONNECTION
TOP ANCHOR IS REQUIRED
FOR THERMAL MOVEMENT.
VERTICAL MULLIONS.
MULL ANCHOR AT INTERMEDIATE
"F" ANCHOR
STEP #1 INSTALL VERTICAL MULLIONS AND ANCHORS
SECTION II: VERTICAL FRAME INSTALLATION
PAGE 3
7/2003