Attachment part preparation – EFCO 403 Series Roto Vent for Storefront User Manual

Page 10

Advertising
background image

after the unit is installed.

STEP 4) Pre-drill the meeting rail with a #18 drill (.170 dia.) 2" from the ends and

16" on center. The TEK screws (STK0) will be used to attach the tube retainer

(STK0)

CONT.

SECTION V -

ATTACHMENT

PART PREPARATION &

.170 DIA. THRU DRILL

ON CENTERS

MEETING RAIL

(9952)

EXTERIOR SIDE

2" FROM END & 16"

(9953)

RETAINER

#8x1" P.H.TEK

PAGE 9

Advertising
This manual is related to the following products: