Attachment part preparation – EFCO 403 Series Roto Vent for Storefront User Manual

Page 12

Advertising
background image

SCREW SPLINE ATTACHMENT METHOD

STEP 5)

STEP 6)

Determine the location of the roto-vent. Mark the layout of the screw spline

attachment screws using the template provided with these instructions.

Drill through the open back verticals with a #18 drill (.170 dia.).

Use a butyl sealant at both
the ends of the roto-vent
meeting rail and sill member
as shown in the shaded areas.

CONT.

ATTACHMENT

PART PREPARATION &

SECTION V -

PAGE 11

#18 drill thru (.170 dia.)
clear hole for
S-100 (#8 x 1" SL.HW.SMS.)
(5 HOLES)

Advertising
This manual is related to the following products: