EFCO 5XPT Series User Manual
Page 31
Advertising
![background image](/manuals/636035/31/background.png)
EFCO CORPORATION 6/8/2012 PART NO. YW44
Page 31 of 34
5XPT SLIDING GLASS DOOR INSTALLATION INSTRUCTIONS
16. The operable panel will load from the exterior, same as the fixed panel.
With the bottom of the operable panel angled outward, tuck into the exterior track of the door
frame head. Lift and push the bottom end in and allow the panel’s rollers to rest on the roller
track. (See Fig. 15)
EXTERIOR
Fig. 15
Advertising