Step 1 – General Hydroponics New RainForest 36 User Manual

Page 3

Advertising
background image

ASSEMBLY

STEP 1

Place the Pump Assembly inside reservoir. The pump output should point straight up
and hit the spray diffuser under the center of the Hex Lid.

STEP 2

Place the Hex Lid on top of the Hex Reservoir and route the pump cord through the slot
provided in one of the 3” openings.

Advertising