Step 1, Step 3, Step 2 – General Hydroponics WaterFarm User Manual

Page 3

Advertising
background image

ASSEMBLY

STEP 1

Insert black DLT Clip into
Reservoir as shown.

STEP 3

Place the Growing Chamber
on the Reservoir.

STEP 2

Install the blue Drain Level Tube by
inserting the elbow through the rubber
grommet from the outside while
supporting the grommet from the inside.
The Drain Level Tube is supported by the
DLT Clip for normal operation and rotate
the Drain Level Tube level with the bottom
of the Reservoir to drain the system.

Advertising