ISSPRO R82289 User Manual

Performax

Advertising
background image

PERFORMAX

Form No. IS153 (Rev. B 10/01/2009

)

ISSPRO, INC.

2515 N.E. Riverside Way

Post Office Box 11177

Portland, Oregon 97211-1899

503-288-4488

800-888-8065

Fax: 503-249-2999

www.isspro.com

© 2008 ISSPRO, Inc. All Rights Reserved.


FUEL RAIL PRESSURE GAUGE AND WIRE HARNESS
INSTALLATION INSTRUCTIONS

Models: R43288 R52288 R53288 R59288 R68288 R69288 R82288

(Model/Years: 2003 - 2007 5.9L Cummins, 2007 - Present 6.7L Cummins,

2001 – Present 6.6L Duramax)

1



Disconnect batteries. Do not reconnect battery power until system is

fully configured to avoid risk of shock or fire.

2

Install Electronic Signal Processor (ESP) and ESP harness according to

instructions.

I C O N K E Y

CAUTION

Tools may be required

Shown in picture

3



Connect the Rail Pressure Harness to the ESP Harness as follows:

a. Remove plugs from cavities 4 and 5 of the connector D (brown) of the ESP.
b. Using a pair of needle nose pliers, pull the orange wedge lock out of connector D.
c. Insert the terminal from the black wire (sensor supply ground) into cavity 4 of connector D on

the ESP, pushing until it snaps into connector D.

d. Insert the terminal from the green wire into cavity 5 (sensor input) of connector D on the ESP,

pushing it until it snaps in place.

e. Note: Terminals will be close to flush with the top of the connector when fully seated.
f. A firm pull of the wire will confirm whether they are properly seated.
g. Push orange wedge-lock back into position. If any of the wires are not fully seated, wedge-lock

will not insert into position.

h. Reconnect connector D (brown) to the ESP.

Figure

1: Connector D top and bottom

view. Shown with plugs and wedge-lock
installed.

Figure 2: Remove plugs and wedge-lock as
shown. Wedge-lock is replaced once wires are
positioned properly.




Advertising
This manual is related to the following products: