ISSPRO R82900 User Manual

Performax, Fuel level gauge installation instructions

Advertising
background image

PERFORMAX

Form No. IS152 (Rev. A 03/11/2008

)

ISSPRO, INC.

2515 N.E. Riverside Way

Post Office Box 11177

Portland, Oregon 97211-1899

503-288-4488

800-888-8065

Fax: 503-249-2999

www.isspro.com

© 2008 ISSPRO, Inc. All Rights Reserved.

FUEL LEVEL GAUGE INSTALLATION INSTRUCTIONS

Models: R43900 R52900 R53900 R59900 R68900 R69900 R82900

Note: Can not be used on systems that contain Performax Front Axle Temp Gauge

1



Disconnect batteries. Do not reconnect battery power until system is

fully configured to avoid risk of shock or fire.

2

Install Electronic Signal Processor (ESP) and ESP harness according to

instructions.

I C O N K E Y

CAUTION

Tools may be required

Shown in picture

3



Connect the Fuel Level Sensor Harness to the ESP Harness as follows:

a. Remove plugs from cavities 1 and 2 of the connector D (brown) of the ESP.
b. Using a pair of needle nose pliers, pull the orange wedge lock out of connector D.
c. Insert the terminal from the white wire (Sensor Signal) into cavity 1 of connector D on the

ESP, pushing until it snaps into connector D.

d. Insert the terminal from the black wire (Sensor Ground) into cavity 2 of connector D on the

ESP, pushing until it snaps into connector D.

e. Note: Terminals will be close to flush with the top of the connector when fully seated.
f. A firm pull of the wire will confirm whether they are properly seated.
g. Push the orange wedge lock back into position. If any of the wires are not fully seated, the

wedge lock will not insert into position.

h. Reconnect connector D (brown) to the ESP.

Figure

1: Connector D top and bottom

view. Shown with plugs and wedge-lock
installed.

Figure 2: Remove plugs and wedge-lock as
shown. Wedge-lock is replaced once wires are
positioned properly.



4

Connect fuel level gauge to the ESP. (See ESP instructions for more details on how to do this).

Note: If drilling a mounting hole in a panel to mount this gauge, the hole size should be 2.040”.

5

Secure all wiring so that it does not interfere with moving parts or chafe on sharp edges. This may

be accomplished by routing the wiring within the factory wire harness sheath, using wire ties and
sheathing, and using appropriate grommets when passing through the firewall.

Advertising
This manual is related to the following products: