DOOR & FRAME CHECKLIST

Inspect door to make sure no damage occurred in shipping. The door should have a seal installed in the

top rail and also a sweep gasket at the bottom rail see details below. If these are not in place or have

been damaged, install as shown below or contact your dealer for replacement. The door package should

also contain the door glass stops hooked in place, a roll of FG-1133 gasket, hinge hardware and your

push pull or panic hardware as required for your project.

Remove door frame from package and inspect for damage. The door package should contain a package

of shear blocks and fasteners for frame assembly. There will also be a threshold, threshold clip package
and various fasteners for attachment of threshold to frame. A standard package of anchor screws and

inserts may also be in the frame packaging, but project requirements may require use of other fasteners

at this area. Packaging does not contain any fasteners for securing your door frame to the opening of
your wall system or building.

Phone: 1-866-OLDCASTLE (653-2278)

Web Address: www.oldcastlebe.com

3

MAY 2013

AD-375 THERMAL DOOR

AD-114 with

GP-157 gasket

60705 (#10 X 3/4" hh tek)

(3) places

GP-156

Bottom Rail Seal