UC1 UNIVERSAL CONTROL CONNECTED WITH A 24 VAC ELECTRONIC IGNITION MODULE

XN

R

UNIVERSAL CONTROLLER

D/N 9183046-8

115 VAC

24 VAC

LEGEND:

HONEYWELL IGNITION

CONTROL

MV

MV

PV

CALL

AS APPLIANCE INTERLOCK VOLTAGE.

RED JUMPER POSITION MUST BE THE SAME

XL

J1

J2

DRY

115V

24V

IMPORTANT:

PV

MV / PV (2)

MV (1)

PV (3)

BNR GND (4)

24V GND (5)

24V (6)

(7)

(8)

SPARK (9)

OR

PI

YE

GR

YE

WH

OR

YE

WH

OR

GR

GAS VALVE

JUMPER

50/60 Hz

SUPPLY
115 VAC

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

1. Remove the wire on MV at gas valve and connect it on #1 on UC1 terminal block.
2. Connect #2 on UC1 terminal block to MV/PV.
3. Connect #4 on UC1 terminal block to MV on gas valve.
4. Make sure RED voltage jumper on UC1 is on 24V.
5. Connect 115 VAC supply voltage to L & N terminals on UC1. Crimp Ground wire to grounding spade terminal in UC1.

Important: Installer must supply overload and disconnect protection.

6. If not previously completed, connect ground from UC1 whip to grounding stud in Venter. Connect Black and White leads

from UC1 whip to Venter motor leads. Connect Blue and Yellow leads from UC1 whip to Fan Prover switch terminals in
Venter. Yellow lead should be on switch terminal closest to Venter junction box wall.

UC1 UNIVERSAL CONTROL CONNECTED WITH A 24 OR 115 VAC STANDING PILOT

115V

24V

DRY

OF FURNACE/BOILER

INTERNAL CONTROLS

24V OR 115V GAS VALVE

HOT

COM

B2

COM
TR

Aquastat

T-stat

TH

HOT

B1

XL

UNIVERSAL CONTROLLER

XN

J1

J2

D/N 9183046-1

24 OR 115 VAC

LEGEND:

CALL
JUMPER

115 VAC

50/60 Hz

SUPPLY
115 VAC

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

RED JUMPER POSITION MUST BE THE SAME

AS APPLIANCE INTERLOCK VOLTAGE.

IMPORTANT:

1. Remove the wire on TH or HOT of gas valve and connect it on #1 on UC1 terminal block.
2. Connect #2 on UC1 terminal block to TR or Common.
3. Connect #4 on UC1 terminal block to TH or HOT on gas valve.
4. Make sure RED voltage jumper on UC1 is on 24V or 115V depending on control voltage.
5. Connect 115 VAC supply voltage to L & N terminals on UC1. Crimp Ground wire to grounding spade terminal in UC1.

Important: Installer must supply overload and disconnect protection.

6. If not previously completed, connect ground from UC1 whip to grounding stud in Venter. Connect Black and White leads

from UC1 whip to Venter motor leads. Connect Blue and Yellow leads from UC1 whip to Fan Prover switch terminals in
Venter. Yellow lead should be on switch terminal closest to Venter junction box wall.