Stack cabling configurations, Step 2, Step 3 – Cisco 3130 User Manual

Page 38

Advertising
background image

2-18

Cisco Catalyst Blade Switch 3130 for Dell and Cisco Catalyst Blade Switch 3032 for Dell Hardware Installation Guide

OL-13269-01

Chapter 2 Switch Installation

Planning and Creating a Switch Stack (Only 3130G-S and 3130X-S Switches)

Step 2

Connect the StackWise Plus cables as described in the

“Planning and Creating a Switch Stack (Only

3130G-S and 3130X-S Switches)” section on page 2-17

.

Step 3

Configure the member switches through the master switch by using the CLI.

Stack Cabling Configurations

This section describes the recommended configurations for stacking the switches by using the supplied
1-meter StackWise cable.

In this example, the stack uses the 1-meter StackWise Plus cable to make redundant connections between
two Catalyst 3130 switches in a single chassis (see

Figure 2-8

).

Figure 2-8

Stacking Two Switch Modules in a Single Blade Server to Create One Stack

250291

WS-CBS3130X-

S

X2-2

23

24

A

B

STK

WS-CBS3130X-

S

X2-2

23

24

A

B

STK

Advertising