Welch Allyn Mach 6 Quick Reference Guide - Quick Reference Guide User Manual

Mach 6 quick reference guide, Maintenance checks

Advertising
background image

MACH 6 Quick Reference Guide

K990291 Rev. C

Daily Requirements

Powder Canister Level and moisture

Monthly Requirements

Filters and Moisture

Handpiece/s Handpiece Hose/s and Nozzles

Pinch Tube (check)

Quarterly Requirements

Pinch Tube (replace)

BI-Annual Requirements

Pinch Valve Assembly (lubricate)

Inspect Canister components

Annual Requirements

Air In and Out In-Line Filters (replace)

Internal Tubing (re-tube)

Powder Canister (replace components)

Maintenance Checks

No.

Maintenance item

6 mo.

12 mo.

18 mo.

24 mo.

PM 1

Maintain Pinch Valve

XX

XX

XX

XX

PM 2

Replace Filters & Tubing

XX

XX

PM 3

Maintain Powder Canister

XX

XX

PM 4

Calibrate system

XX

XX

XX

XX

PM 1.

Maintain pinch valve block 6/12 Months):

.50 hour

One Year Maintenance Kit

K150034


PM 2.

Replace the Filters and tubing (12 months):

1.0 hour

One Year Maintenance Kit

K150034


PM 3.

Check Powder Canister (6/12 months):

0.5 hour

One Year Maintenance Kit

K150034

Check Canister Gasket and lid

Clear powder ports and back flush canister
Clean Gasket and Canister lid

Clear and measure Orifice Plate holes

Replace powder and verify system operation

Maintain Powder Canister
(12 month)

1.0 hour

One Year Maintenance Kit

K150034


PM 4.

Calibrate system (6 months):

1.0 hour

Verify and calibrate using procedure

Advertising