Industrial Injection 2nd Gen Dodge Cummins Compound Turbo User Manual

Page 4

Advertising
background image

16.

Remove plug from top of oil filter housing and install new oil feed line fitting using Teflon tape.

17.

Install 45 Degree fitting into top of new turbo using Teflon tape.

18.

Install oil filter.

19.

Install 4” cold pipe using rubber boot and clamps make sure to install rubber O ring in flange and adjust

pipe and compressor housing and tighten clamps.

20.

After 4” cold pipe is tight and adjusted tighten compressor housing clamp.

21.

Install air filter Assembly using 5” boots and chrome 90 degree and new clamps. Note some application

require you to relocate horn in the bottom of passenger truck so there is more room for filter.

22.

Install down pipe using supplied 5” clamp. Using the 45 degree 4” pipe you may need to cut to proper

length for precise fit and tighten using band clamp.

23.

Install battery box using stock bolt in the fender and using the stock nut. Using the remaining heat shield

put on the face of the batter box. Connect and route ground and positive battery cables as needed away

from turbo.

24.

Install battery using stock battery bracket along with new battery bracket and bolts and using stock clips

off stock batter tray and secure battery.

25.

Add coolant and check for oil at the turbo feed line on new turbo when tuck is first started. Check for

leaks

Advertising