Operating instructions, Operating instructions 5-1, 1 start up – BendixKing FPI 3501B System FPD 500 User Manual

Page 45: 2 self test

Advertising
background image

FPD 500 FLAT PANEL DISPLAY SYSTEM

5. OPERATING INSTRUCTIONS

Consult Aircraft Flight Manual Supplement for specific procedures
and limitations in operation.

5.1 START UP

When power is initially applied to
the EADI/EHSI system, various
flags may be annunciated on the
displays, representing systems
not yet operational. If all flags do
not clear, then recheck the
annunciated system.

Adjust brightness control on the
EADI and EHSI to desired bright-
ness.

5.2 SELF TEST

Performing the Self Test is not
required at any time. If a failure was to occur or exist, the failure
would be annunciated. This test is intended to familiarize the operator
with the various flagging methodology used and a quick check for
proper color presentation.

Self Test is inhibited during ILS mode if both glideslope and localizer
are valid.

Operating Instructions

5-1

Rev. 0
Jan/97

A

N

M

R

I

DIM

TEST

BRT

Figure 5.1-1

Bezel

Advertising