Power application and preflight tests, Introduction 4, Kfc 225 preflight test complete – BendixKing KI 525A System KFC 225 User Manual

Page 10

Advertising
background image

Introduction

4

KFC 225 AUTOMATIC FLIGHT CONTROL SYSTEM

Rev. 0

Apr/99

AP

VS

ARM

G

KFC 225

HDG

NAV

APR

REV

ALT

FD

DN

UP

YD

P R

ALT SEL

KFC 225 Preflight Test Complete

AP

VS

ARM

G

KFC 225

HDG

NAV

APR

REV

ALT

FD

DN

UP

YD

P R

ALT SEL

KFC 225 Preflight Test

Power Application and Preflight Tests

A preflight test is performed

upon power application to the com-
puter. This test is a sequence of
internal checks that validate proper
system operation prior to allowing
autopilot engagement. The preflight
test (PFT) sequence is indicated by
“PFT” with an increasing number for
the sequence steps. Successful
completion of self test is identified by
all display segments being illumi-
nated (Display Test), the Flight
Director command bars brought into
view and the disconnect tone sound-
ing.

NOTE: Following the preflight test,
the red P warning on the face of the
autopilot may illuminate indicating
that the pitch axis cannot be
engaged. This condition should be
temporary, lasting no more than 30
seconds. The P will extinguish and
normal operation will be available.

Advertising
This manual is related to the following products: