3

30GXN,R UNITS ONLY — Using good brazing practice,
braze the

5

/

8

-in. minimum load tubing to the copper nipple on

the discharge line (minimum load port) between the condenser
coil and oil separator. See Fig. 1, 3A and 3B.

Step 3 — Dehydrate and Recharge Circuit —

When piping has been completed, leak test the assembly. If
one of the O-ring seal fittings leaks, slowly tighten the O-ring
nut until the leak stops. If this does not fix the leak, the connec-
tion must be reinstalled using a new O-ring in the fitting. Con-
tact your Carrier representative for assistance in locating these
parts.

After leak testing, evacuate, dehydrate, and recharge the cir-

cuit using an approved refrigerant recovery device. Correct
type and amount of refrigerant are listed on unit nameplate and
in base unit documentation.

Step 4 — Install Control Wiring

Wires between field-installed components and unit control

box must be enclosed in field-supplied conduit. Follow all local

codes and NEC (National Electrical Code, U.S.A.). Wire size
must be no. 16 AWG (American Wire Gage) (1.5 mm

2

) mini-

mum. See Fig. 4 and 5 for field wiring.
30HX UNITS — Remove the screws holding the right-side
access panel to the unit control box. Open the right-side access
panel.

Route wires through field-supplied conduit and attach the

conduit to the unit control box, using a suitable conduit fitting
and one of the available

7

/

8

-in. knockout openings. Attach the

other end of the conduit to the solenoid valve, using a suitable
fitting. Repeat for the other circuit. See Fig. 4.
30GXN,R UNITS —Route the field-supplied water proof con-
duit from the solenoid valves to the control box at the end of
the unit. See Fig. 4 and 5.
ALL UNITS — Using good wiring practice, connect a white
wire from the solenoid valve on circuit A to a white wire from
the solenoid valve on circuit B. Connect both wires to TB2-9
(30HX) or TB4-2 (30GX).

Connect a pink wire to the solenoid valve on circuit A.
Connect a gray wire to the solenoid valve on circuit B. Con-

nect both the pink and gray wires to TB5-9 for all units.

Figure 4 shows the correct location of the wiring connection

points on the chiller.

Be sure all power to the unit is off before proceeding. Lock
out and safety-tag all disconnects.

Fig. 2 — Installing Fittings and Valves, 30HX (Typical)