INTRODUCTION

General
Job Data Required

Equipment Required

INITIAL PREPARATION

Machine Tightness
Check for Large Leaks
Check for Small Leaks
Check Leakage Rate
Machine Dehydration
Pumpout Procedures
Oil Charge
Oil Heater

Refrigerant Charge
Inspect Piping
Field Wiring
Check Starter
Check Operation of Safety Controls
Purge
Air Supply (Pneumatic Controls Only)

START-UP

Before Starting Machine

Compressor Rotation

Compressor Operation

Checking Safety Control Settings

Setting Operating Controls — Electronic

Motor Current Calibration
Chilled Water Calibration

Setting Operating Controls — Pneumatic

FINAL MACHINE ADJUSTMENT

Trimming Refrigerant Charge

INSTRUCTING THE CUSTOMER
OPERATOR

Page

3

3
3
3
3
4
4
4
5
5

5

6

6

7
7

7
7
7
7
7
9
9

10

10

12

12

1 2

INTRODUCTION

General

— All persons involved in start-up and

operation of the 19CB machine should be famihar
with these instructions and all necessary job data

before initial start-up. Instructions are arranged in
proper sequence for machine start-up.

Job Data Required

1. List of applicable design temperatures and

pressures

2. Machine assembly, wiring and piping prints

3 19CB Installation Instructions

4. 19CB Operating and Maintenance Instructions

Equipment Required

1. Mechanic’s tools

2 Volt-ohmmeter and clamp-on ammeter

3. Manometer, absolute pressure type

4. Leak detector, halide or electronic

5. Refrigerant drum charging valve (Fig. 5)

6. 5/8-in. SAE X 3/4-in. MPT adapter
7. Five to ten ft of copper tubing or plastic hose

to fit 5/8-in. SAE connections

8. Portable vacuum pump

INITIAL PREPARATION

CAUTION: Do

noi

start

compr&ssox or oil

pump, even for a rotation check, unless conv
pxessor is charged with <ni and machine charged
with refrigerant.

Do not apply voltage of

my

kina wihle

machine is under dehydration vacuum.

© Carrier Corporation 1973